Optimizing Road Pavement Projects Through Earned Value Concepts

Jufriza Jufriza, Yulius Rief Alkhaly, Abdul Jalil

Abstract


Every construction project faces constraints of cost, schedule, and quality that must be managed to achieve the desired objectives. This research aims to control the aspects of time and cost in construction projects by applying the Earned Value Concept and Crash Program methods. The subject of the study is the Preservation of Roads and Bridges project in Bireuen City - BTS, Lhokseumawe/Aceh Utara, Krueng Mane Buket Rata, SP. Krueng Geukeueh - PEL. Krueng Geukeueh (PEL. Lhokseumawe). The data analyzed includes the Budget Plan (RAB), project schedule, and reports on planned and actual work. This data is processed into three main indicators: BCWS, BCWP, and ACWP, which are then analyzed through Schedule Variance (SV), Cost Variance (CV), Schedule Performance Index (SPI), and Cost Performance Index (CPI). The analysis results show that during weeks 22 to 23, the project had a positive Schedule Variance (SV) (>0), which then turned negative during weeks 24 to 28, with an average Schedule Performance Index (SPI) of 1.0096, indicating that project execution was ahead of schedule. Meanwhile, the Cost Variance (CV) was positive throughout the project, and the average Cost Performance Index (CPI) was 1.2118, indicating that actual costs did not exceed the budget. The application of the Crash Program method resulted in changes in heavy equipment rental costs and worker wages, from IDR 1,440,469,946.99 over 50 days to IDR 1,853,072,988.06 over 25 days, with a cost increase of IDR 412,603,041.07 and an acceleration ratio of 1.29. This research demonstrates that the Earned Value Concept and Crash Program methods are effective in controlling time and cost in construction projects, thereby helping to achieve better efficiency in project management.


Keywords


Earned Value Management, Cost Variance, Cost Performance Index

Full Text:

PDF

References


H. R. Kerzner, Project Management: A Systems Approach to Planning, Scheduling, and Controlling, New York: John Wiley & Sons, Inc, 2008.

R. K. Wysocki, Effective Project Management: Traditional, Agile, Extreme, Hybrid, New York: John Wiley & Sons, Inc, 2019.

P. M. Institute, Practice standard for earned value management. Pennsylvania: Project Management Institute, Inc., 2005.

S. Choiriyah, D. Listyaningsih, F. Nuciferani, F. Ferdaus, G. S. Perdana, and R. Sekartadji, “Performance Evaluation of Projects using Earned Value Concept,” Jurnal Teknologi dan Manajemen, vol. 5, no. 1, 2024. [Online]. Available: https://doi.org/10.31284/j.jtm.2024.v5i1.4620.

M. Breuker, “Earned Value Management: An Introduction,” 2021. [Online]. Available: https://www.pinnaclemanagement.com/blog/earned-value-management-an-introduction

M. I. Kurniawan, D. Ayu, R. Wulandari, dan J. Tistogondo, “Evaluation of Construction Project Time And Cost Control Based On Earned Value And Crash Project Method (A case study on the construction project of the State Junior High School 1 Surabaya),” Jurnal Neutron, vol. 21, 2021.

R. K. M. Gopang dan I. A. Rahman, “Effective Project Control Techniques Assessment in Saudi Arabian Construction Industry,” Journal of Positive School Psychology, vol. 6, no. 3, hlm. 236–242, 2022.

M. G. Malinawan, “Project Quality Management: A Guide for Project Managers,” 2024. [Online]. Available: https://www.rosemet.com/project-quality-management/

W. C. Watanabe, M. Shafiq, S. Ali, M. J. Nawaz, dan S. Nazeer, “The impact of triple constraints on the project success, a moderating role of organizational support,” Journal of Project Management, vol. 9, no. 1, hlm. 73–84, Jan 2024.

H. Mikkelsen and J. O. Riis, Project Management: A Multi-Perspective Leadership Framework, Leeds: Emerald Publishing Limited, 2017. [Online]. Available: https://doi.org/10.1108/978-1-78714-829-120171016

C. T. Horngren, S. M. Datar, and M. V. Rajan, Cost Management: A Strategic Emphasis, New York: Pearson Education Limited, 2012.

A. Widiyanto Nugroho dan H. Fithra, “Identification of Factors Caused The Risk of Time Delays in The Pulogadung,” International Journal of Engineering, Science & InformationTechnology (IJESTY), vol. 2, no. 2, hlm. 41–52, 2022.

J. M. Nicholas and H. Steyn, Project Management for Engineering, Business, and Technology, Butterworth-Heinemann: Elsevier Ltd, 2012.

R. Klein, Scheduling of Resource-Constrained Projects, Boston: Kluwer Academic Publisher, 1999.

I. Anwarsyah and E. Ahyudanari, “Project Performance Analysis Using the Earned Value Management (EVM) Method (Case Study: PT XYZ),” IPTEK Journal of Proceedings Series, no. 5, 2019. [Online]. Available: http://dx.doi.org/10.12962/j23546026.y2019i5.6280

D. Irniawan, W. Oetomo, and R. Marleno, “Cost and Time Analysis Using Earned Value Method In Administration Building Contruction Project At Polije Campus”, IJATEIS, vol. 2, no. 4, pp. 423–432, Jan. 2024.

V. Aramali, G. E. Gibson, M. El Asmar, and N. Cho, “Earned Value Management System State of Practice: Identifying Critical Subprocesses, Challenges, and Environment Factors of a High-Performing EVMS,” Journal of Management in Engineering, vol. 37, no. 4, 2021. [Online]. Available: https://doi.org/10.1061/(ASCE)ME.1943-5479.0000925

Q. W. Fleming and J. M. Koppelman, Earned Value Project Management, California: Project Management Institute, 2016.

P. Landau, “Using Earned Value Management to Measure Project Performance,” 2024. [Online]. Available: https://www.projectmanager.com/blog/using-earned-value-management-to-measure-project-performance

S. Romadhona, F. Kurniawan, dan J. Tistogondo, “Project Scheduling Analysis Using the Precedence Diagram Method (PDM) Case Study: Surabaya’s City Outer East Ring Road Construction Project (Segment 1),” International Journal of Engineering, Science and Information Technology (IJESTY), vol. 1, no. 2, hlm. 53–61, 2021.




DOI: https://doi.org/10.52088/ijesty.v4i4.602

Article Metrics

Abstract view : 0 times
PDF - 0 times

Refbacks

  • There are currently no refbacks.


Copyright (c) 2024 Jufriza, Yulius Rief Alkhaly, Abdul Jalil

International Journal of Engineering, Science and Information Technology (IJESTY) eISSN 2775-2674