Analysis of Time Comparison and Costs of Implementing Road Implementation with Time Cost Trade-Off Method
Abstract
Keywords
Full Text:
PDFReferences
J. Ferdian, M. Isya, and H. A. Rani, “PENERAPAN VALUE ENGINEERING PEKERJAAN BANGUNAN BAWAH JEMBATAN PADA PEKERJAAN PONDASI TIANG PANCANG,†Pascasarj. Univ. Syiah Kuala, 2015.
L. Sugiharti, R. Purwono, M. R. Primanthi, and M. A. Esquivias, “Indonesia industrial productivity growth: Evidence of Re-industrialization or De-industrialization?,†Period. Polytech. Soc. Manag. Sci., vol. 27, no. 2, 2019, doi: 10.3311/PPso.12489.
R. W. Kisworo1, F. S. Handayani, and Sunarmasto, “Analisis Percepatan Proyek Menggunakan Metode C Os T Tr a D E of F Dengan Penambahan Jam Kerja Lembur Dan Time Jumlah Alat,†e-Jurnal MATRIKS Tek. SIPIL, no. September 2017, 2017.
R. W. Kisworo and S. Handayani, Fajar S., “Analisis Percepatan Proyek Menggunakan Metode Time Cost Trade Off Dengan Penambahan Jam Kerja Lembur dan Jumlah Alat,†e-Jurnal Matriks Tek. Sipil, no. September 2017, 2017.
R. Widyo Kisworo and F. Sri Handayani, “Analisis Percepatan Proyek Menggunakan Metode Time Cost Trade Off Dengan Penambahan Jam Kerja Lembur Dan Jumlah Alat,†e-Jurnal Matriks Tek. Sipil, no. September 2017, 2017.
M. Fazri, M. Widiastuti, and M. Jamal, “Analisis Percepatan Waktu Dengan Menggunakan Metode Time Cost Trade Off Pada Proyek Pembangunan Rusun 1 Kota Samarinda Kalimantan Timur,†Teknol. Sipil, vol. 3, no. 2, 2020.
R. Mirsa, M. Muhammad, F. Fidyati, E. Saputra, and M. Rumiza, “Space Transformation in Residential House Small Entrepreneurs Banana Sale,†Int. J. Eng. Sci. Inf. Technol., vol. 1, no. 4, 2021, doi: 10.52088/ijesty.v1i4.167.
A. Muharani, I. P. Mulyatno, and ..., “Optimasi Percepatan Proyek Pembangunan Kapal Kelas I Kenavigasian dengan Metode Pendekatan Analisa Time Cost Trade Off,†J. Tek. …, 2020.
S. A. Banihashemi and M. Khalilzadeh, “Time-cost-quality-environmental impact trade-off resource-constrained project scheduling problem with DEA approach,†Eng. Constr. Archit. Manag., vol. 28, no. 7, 2020, doi: 10.1108/ECAM-05-2020-0350.
K. Y. Lee and S. M. Yoon, “Managerial ability and tax planning: Trade-off between tax and nontax costs,†Sustain., vol. 12, no. 1, 2020, doi: 10.3390/SU12010370.
R. Rinaldy and M. Ikhsan, “Determinant Analysis Of Conflict On Project Results In Aceh Province,†Int. J. Eng. Sci. Inf. Technol., vol. 1, no. 1, 2021, doi: 10.52088/ijesty.v1i1.37.
S. Romadhona, F. Kurniawan, and J. Tistogondo, “Project Scheduling Analysis Using the Precedence Diagram Method (PDM) Case Study: Surabaya’s City Outer East Ring Road Construction Project (Segment 1),†Int. J. Eng. Sci. Inf. Technol., vol. 1, no. 2, 2021, doi: 10.52088/ijesty.v1i2.56.
R. Y. Widya Baskara, A. Wahyuni, and F. Hardanignrum, “The Effect Of Road Narrowing On The Traffic Characteristics,†Int. J. Eng. Sci. Inf. Technol., vol. 1, no. 2, 2021, doi: 10.52088/ijesty.v1i2.54.
N. Izzah, “Analisis Pertukaran Waktu dan Biaya Menggunakan Metode Time Cost Trade Off (TCTO) pada Proyek Pembangunan Perumahan di PT. X,†Rekayasa, vol. 10, no. 1, 2018, doi: 10.21107/rys.v10i1.3604.
J. A. J. Salaveria-Olaer, A. A. Wellms, and B. L. Maratas, “Classroom Culture in English Classes of the Mindanao State University -Tawi-Tawi College of Technology and Oceanography (MSU-TCTO): Prospect for Institutionalizing Ambitious Teaching,†Pertanika J. Soc. Sci. Humanit., vol. 28, no. SUPPL.2, 2020.
V. Lafage et al., “Sagittal spino-pelvic alignment failures following three column thoracic osteotomy for adult spinal deformity,†Eur. Spine J., vol. 21, no. 4, 2012, doi: 10.1007/s00586-011-1967-3.
N. E. Vebiola and J. P. H. Waskito, “Analisis Optimasi Waktu dan Biaya dengan Mwtode Time Cost Trade Off (Studi Kasus: Proyek Pembangunan Basement Kawasan Balai Pemuda ),†J. Rekayasa dan Manaj. Konstr., vol. 8, no. 2, 2020.
DOI: https://doi.org/10.52088/ijesty.v1i1.248
Article Metrics
Abstract view : 43 timesPDF - 20 times
Refbacks
- There are currently no refbacks.
Copyright (c) 2021 Evita Shintia Wulandari, Koes Piadi, Diah Ayu Restuti Wulandari