Identification of Factors Caused The Risk of Time Delays in The Pulogadung

Anwar Widiyanto Nugroho, Tukiyo Tukiyo, Herman Fithra

Abstract


To provide livable housing for the residents of DKI Jakarta, especially in urban areas with minimal land availability, the DKI Jakarta Provincial Government supports the development of vertical housing to offset the high demand for housing and limited land. Through the Department of Public Housing and Settlement Areas, the Provincial Government of DKI Jakarta is implementing the Pulogadung-East Jakarta PIK Flats Construction Project. When this research was carried out, the Pulogadung-East Jakarta PIK Flats Construction Project was entering week 63, with work progress reaching 47.689% of the planned 48.725%, or in other words, this project experienced a delay of 1.036% of the scheduled. Therefore, it is necessary to conduct research that aims to identify the factors that cause the risk of time delays, analyze the most dominant factors that lead to the risk of time delays, and look for the necessary handling actions so that the risk of time delays that occur does not increase or can also be prevented or resolved. In this study, the descriptive quantitative method is carried out by surveys, interviews, and distributing questionnaires to respondents. The risk rating was analyzed using MS. Excel is based on a probability and impact matrix, which aims to determine variables with a high level of risk, then expert validation is carried out regarding risk management. And from the analysis results obtained, six variables that cause the risk of time delays in the Pulogadung-East Jakarta PIK Flats Development Project work can occur, namely Late Payment of Term by Owner, Design Changes, Lack of Coordination While Working, Inaccuracy of Material Order, Time, Limited Material Availability in the Market, and the Occurrence of the Corona Outbreak (Covid 19). The results of expert recommendations for the six variables can be expressed in handling actions.

Keywords


Risk Management, Time Delay, Construction Management

Full Text:

PDF

References


M. A. Apriliyani, “Analisa Keterlambatan Berbasis Manajemen Risiko Pada Proyek Warehouse Lazada Tahap 2,†Rekayasa Sipil, vol. 8, no. 2, 2020, doi: 10.22441//jrs.2019.v08.i2.02.

M. Andriani, H. Irawan, and N. Rizqa Asyura, “Improving Quality Using The Kano Model in Overcoming Competition in The Service Industry,†Int. J. Eng. Sci. Inf. Technol., vol. 1, no. 4, 2021, doi: 10.52088/ijesty.v1i4.145.

N. C. Fertilia and N. Aulia, “Analis Risiko Penyebab Keterlambatan Pekerjaan Lift Pada Proyek Pembangunan Rumah Susun Di PT. AB,†J. Tek. Sipil, vol. IX, no. 2, 2020.

M. Ikhsan and R. Rinaldy, “Estimated Flood Discharge in Downstream Krueng Meureubo of Pasi Pinang Section West Aceh Regency,†Int. J. Eng. Sci. Inf. Technol., vol. 1, no. 1, 2021, doi: 10.52088/ijesty.v1i1.41.

B. R. Kani, R. J. M. Mandagi, J. P. Rantung, and G. Y. Malingkas, “Keselamatan Dan Kesehatan Kerja Pada Pelaksanaan Proyek Konstruksi (Studi Kasus: Proyek Pt. Trakindo Utama),†J. Sipil Statik, 2013.

I. Ismiyati, R. Sanggawuri, and M. Handajani, “Penerapan Manajemen Resiko pada Pembangunan Proyek Perpanjangan Dermaga log (Studi Kasus: Pelabuhan DalamTanjung Emas Semarang),†MEDIA Komun. Tek. SIPIL, vol. 25, no. 2, 2020, doi: 10.14710/mkts.v25i2.19467.

J. S. Pasaribu, “Development of a Web Based Inventory Information System,†Int. J. Eng. Sci. InformationTechnology, vol. 1, no. 2, pp. 24–31, 2021, doi: 10.52088/ijesty.v1i2.51.

R. Rinaldy and M. Ikhsan, “Determinant Analysis Of Conflict On Project Results In Aceh Province,†Int. J. Eng. Sci. Inf. Technol., vol. 1, no. 1, 2021, doi: 10.52088/ijesty.v1i1.37.

D. S. Nurhuda, W. Sutrisno, and D. L. C. Galuh, “Analisis Risiko Keterlambatan Waktu Pada Pelaksanaan Proyek Pembangunan SPBU (Studi Kasus di Kabupaten Bantul, Yogyakarta),†Bangun Rekaprima, vol. 05, 2019.

T. M. Sudarsono, O. Christie, and Andi, “Analisis Frekuensi, Dampak, Dan Jenis Keterlambatan Pada Proyek Konstruksi,†J. Dimens. Pratama Tek. Sipil, vol. 3, no. 2, 2014.

N. Sana Ose, B. Mochtar, and M. Tohir, “Analisa Faktor Penyebab Terjadinya Keterlambatan Pelaksanaan Pada Proyek Pembangunan Gedung Kantor DPRD Kota Samarinda,†Kurva S J. Mhs., 2021.

R. N. Putri, A. Sandyavitri, and A. Malik, “Evaluasi Risiko Keterlambatan pada Proyek Konstruksi Pembangkit Listrik Tenaga Uap (PLTU) Tembilahan,†Jom FTEKNIK, vol. 4, no. 2, 2017.

Y. Yurike, Y. Yonariza, and R. Febriamansyah, “Patterns of Forest Encroachment Behavior Based on Characteristics of Immigrants and Local Communities,†Int. J. Eng. Sci. Inf. Technol., vol. 1, no. 4, 2021, doi: 10.52088/ijesty.v1i4.175.

N. Maelissa, W. Gaspersz, and S. Metekohy, “DAMPAK PANDEMI COVID-19 BAGI PELAKSANAAN PROYEK KONSTRUKSI DI KOTA AMBON,†J. SIMETRIK, vol. 11, no. 1, 2021, doi: 10.31959/js.v11i1.21.

A. Safira, A. Chandrawulan, and P. Faisal, “Pelaksanaan Kontrak Kerja Konstruksi Selama Pandemi Covid-19 Berdasarkan Perspektif Hukum Indonesia,†J. Huk. Doctrin., vol. 6, no. 1, 2021.




DOI: https://doi.org/10.52088/ijesty.v2i2.247

Article Metrics

Abstract view : 94 times
PDF - 32 times

Refbacks

  • There are currently no refbacks.


Copyright (c) 2021 Anwar Widiyanto Nugroho, Tukiyo Tukiyo, Herman Fithra

International Journal of Engineering, Science and Information Technology (IJESTY) eISSN 2775-2674