Identification of Factors Caused The Risk of Time Delays in The Pulogadung
Abstract
Keywords
Full Text:
PDFReferences
M. A. Apriliyani, “Analisa Keterlambatan Berbasis Manajemen Risiko Pada Proyek Warehouse Lazada Tahap 2,†Rekayasa Sipil, vol. 8, no. 2, 2020, doi: 10.22441//jrs.2019.v08.i2.02.
M. Andriani, H. Irawan, and N. Rizqa Asyura, “Improving Quality Using The Kano Model in Overcoming Competition in The Service Industry,†Int. J. Eng. Sci. Inf. Technol., vol. 1, no. 4, 2021, doi: 10.52088/ijesty.v1i4.145.
N. C. Fertilia and N. Aulia, “Analis Risiko Penyebab Keterlambatan Pekerjaan Lift Pada Proyek Pembangunan Rumah Susun Di PT. AB,†J. Tek. Sipil, vol. IX, no. 2, 2020.
M. Ikhsan and R. Rinaldy, “Estimated Flood Discharge in Downstream Krueng Meureubo of Pasi Pinang Section West Aceh Regency,†Int. J. Eng. Sci. Inf. Technol., vol. 1, no. 1, 2021, doi: 10.52088/ijesty.v1i1.41.
B. R. Kani, R. J. M. Mandagi, J. P. Rantung, and G. Y. Malingkas, “Keselamatan Dan Kesehatan Kerja Pada Pelaksanaan Proyek Konstruksi (Studi Kasus: Proyek Pt. Trakindo Utama),†J. Sipil Statik, 2013.
I. Ismiyati, R. Sanggawuri, and M. Handajani, “Penerapan Manajemen Resiko pada Pembangunan Proyek Perpanjangan Dermaga log (Studi Kasus: Pelabuhan DalamTanjung Emas Semarang),†MEDIA Komun. Tek. SIPIL, vol. 25, no. 2, 2020, doi: 10.14710/mkts.v25i2.19467.
J. S. Pasaribu, “Development of a Web Based Inventory Information System,†Int. J. Eng. Sci. InformationTechnology, vol. 1, no. 2, pp. 24–31, 2021, doi: 10.52088/ijesty.v1i2.51.
R. Rinaldy and M. Ikhsan, “Determinant Analysis Of Conflict On Project Results In Aceh Province,†Int. J. Eng. Sci. Inf. Technol., vol. 1, no. 1, 2021, doi: 10.52088/ijesty.v1i1.37.
D. S. Nurhuda, W. Sutrisno, and D. L. C. Galuh, “Analisis Risiko Keterlambatan Waktu Pada Pelaksanaan Proyek Pembangunan SPBU (Studi Kasus di Kabupaten Bantul, Yogyakarta),†Bangun Rekaprima, vol. 05, 2019.
T. M. Sudarsono, O. Christie, and Andi, “Analisis Frekuensi, Dampak, Dan Jenis Keterlambatan Pada Proyek Konstruksi,†J. Dimens. Pratama Tek. Sipil, vol. 3, no. 2, 2014.
N. Sana Ose, B. Mochtar, and M. Tohir, “Analisa Faktor Penyebab Terjadinya Keterlambatan Pelaksanaan Pada Proyek Pembangunan Gedung Kantor DPRD Kota Samarinda,†Kurva S J. Mhs., 2021.
R. N. Putri, A. Sandyavitri, and A. Malik, “Evaluasi Risiko Keterlambatan pada Proyek Konstruksi Pembangkit Listrik Tenaga Uap (PLTU) Tembilahan,†Jom FTEKNIK, vol. 4, no. 2, 2017.
Y. Yurike, Y. Yonariza, and R. Febriamansyah, “Patterns of Forest Encroachment Behavior Based on Characteristics of Immigrants and Local Communities,†Int. J. Eng. Sci. Inf. Technol., vol. 1, no. 4, 2021, doi: 10.52088/ijesty.v1i4.175.
N. Maelissa, W. Gaspersz, and S. Metekohy, “DAMPAK PANDEMI COVID-19 BAGI PELAKSANAAN PROYEK KONSTRUKSI DI KOTA AMBON,†J. SIMETRIK, vol. 11, no. 1, 2021, doi: 10.31959/js.v11i1.21.
A. Safira, A. Chandrawulan, and P. Faisal, “Pelaksanaan Kontrak Kerja Konstruksi Selama Pandemi Covid-19 Berdasarkan Perspektif Hukum Indonesia,†J. Huk. Doctrin., vol. 6, no. 1, 2021.
DOI: https://doi.org/10.52088/ijesty.v2i2.247
Article Metrics
Abstract view : 94 timesPDF - 32 times
Refbacks
- There are currently no refbacks.
Copyright (c) 2021 Anwar Widiyanto Nugroho, Tukiyo Tukiyo, Herman Fithra