PT. Ika Bina Agro Wisesa (IBAS) is a company that produces products in the form of crude oil or CPO (Crude Palm Oil). The company sets a minimum production target of FFB that must be processed to reach 30 tons in one boiling with a minimum production target of 600 tons/day. The company is required to increase productivity. The problem so far is that the company has never measured the productivity of the production process, which will then affect the achievement of production targets. Measurement of productivity is critical because the measursizeoductivity can determine whether the company meets productivity targets for production or not. Therefore, it is necessary to measure productivity to assess the value of productivity and efforts to increase productivity in CPO production and how to increase productivity in CPO production and efforts to increase productivity using the Objective Matrix (OMAX) method at PT. Ika Bina Agro Wisesa. Analysis of productivity using the OMAX method, ratio 3 (labor productivity) and ratio 4 (machine productivity) has a very high percentage of poor performance, which means that ratio and 4 have an insufficient level of productivity. Unlike the case with the achievement of productivity ratio 1 (productivity of raw materials) and ratio 2 (productivity of working hours) wh, ich shows a low percentage of poor performance, which means that the productivity level of ratio one and ratio 2 has a better productivity level than ratio three and ratio 4 Analysis The results of the productivity index in the company decreased and increased for each month, in November it experienced a decrease of -79.49, while in December it experienced a significant increase in the amount of 595.02 and January at 69.98. in February decreased to -23.63. Furthermore, productivity in March - September 2021 was unstable, with an increase and dropped for July, a decrease of -0.64 and, a slight increase in August of 0.28.
Keywords
Full Text:
PDFReferences
N. Dedi, “Pengukuran Produktvitas Untuk Mengidentifikasi Pemborosan Sumberdaya Produksi Menggunakan Metode Objective Matrix (OMAX) PT.,†in Skripsi. Fakultas Teknik Universitas Tanjung Pura 6, 6th ed., Tanjung Pura, 2012.
I. Alda, T., Siregar, K., “Analisis Sistem Pengukuran Kinerja Dengan Metode Integrated Performance Measurement Systems Pada Pt. X.,†J. Tek. Ind. USU, vol. 2, no. 1, 2013.
W. Ula, M., & Fuadi, “A method for evaluating information security governance (ISG) components in a banking environment,†J. Phys. Conf. Ser., vol. Vol. 812, p. 012031, 2017.
W. Yosan, I. R. B., Kholil, I. M., & Soraya, “Increasing Productivity With Objective Matrix Method Case Study on Building Maintenance Management Pio Pt. Xxx.,†Int. Semin. Ind. Eng. Manag, vol. 9, 2018.
V. Lestari, F., Nuari, I., & Devani, “American Productivity Center Method for Measuring Productivity in Palm Oil Milling Industry.,†Int. Conf. Ind. Eng. Eng. Manag., pp. 754–757, 2018.
D. Irwansyah, “Measurement of Study Productivity and Evaluation Analysis by using the American Productivity Center (APC) Model at a Palm Oil Factory (Pks PT. Syaukath Sejahtera).,†Proc. MICoMS 2017. Emerald Publ. Limited., 2017.
F. Pargar, “Resource optimization techniques in scheduling: applications to production and maintenance systems,†2017.
D. O. Fakorede, A. I. Babatunde, and A. Ovat, “Productivity Increase by Optimum Utilization of Machines and Manpower Energy,†Int. J. Eng. Res. Dev., vol. 10, no. 5, pp. 11–24, 2014.
T. H. S. U. Becker, Huselid, Linking People, Strategy and performance, Havard Business Scholl Pres. Boston. 2001.
Pramestari D, “Penentuan Kriteria Perbaikan Produktivitas Pada Suatu Departemen Kerja Dengan Menggunakan Metode Objective Matrix (OMAX),†IKRA-ITH Teknol. J. Sains Teknol., vol. 2, no. 2, pp. 9–19, 2018.
R. Ula, M., Pratama, A., Asbar, Y., Fuadi, W., Fajri, R., & Hardi, “A New Model of The Student Attendance Monitoring System Using RFID Technology,†J. Phys. Conf. Ser., vol. 1807 No. 1, p. 012026, 2021.
D. Abdullah, “Perancangan Sistem Informasi Pelayanan Kapal,†J. Ilm. Teknol. Inf. Terap., 2015.
M. Sinungan, Produktivitas Apa Dan Bagaimana, 2nd ed. Jakarta: Bumi Aksara, 2008.
L. Syarifuddin, S., & Yani, “Analisis Produktivitas Perusahaan Pada UD. Karya Jaya,†Ind. Eng. J., vol. 3, no. 2, 2014.
V. Gaspersz, Manajemen produktivitas total. Jakarta: Gramedia Pustaka Utama, 2000.
R. B. H. J, Manajemen Operasi, 7th ed. Jakarta: Salemba 4, 2006.
Y. Silalahi, L. A., Rispianda, R., & Yuniar, “USULAN STRATEGI PENINGKATAN PRODUKTIVITAS BERDASARKAN HASIL ANALISIS PENGUKURAN OBJECTIVE MATRIX (OMAX) PADA DEPARTEMEN PRODUKSI TRANSFORMER,†REKA Integr., vol. 1, no. 1, p. 138, 2017, doi: 10.25077/JOSI.V14.N1.P138-155.2015.
rini setiowati, “ANALISIS PENGUKURAN PRODUKTIVITAS DEPARTEMEN PRODUKSI DENGAN METODE OBJECTIVE MATRIX (OMAX) PADA CV. JAYA MANDIRI,†Fakt. Exacta, vol. 10, no. 3, pp. 199–209, 2017.
M. Rumapea, H., Prakqusa, M., Rumapea, Y. Y. P., Larosa, F. G. N., & Yohanna, “Customer Relationship Management by Using Objective Matrix Method to Survey Customer Satisfac-tion.,†Int. Conf. Comput. Sci. Inf. Technol., pp. 1–4, 2019.
Y. Avianda, D., Yuniati, Y., & Yuniar, “Strategi Peningkatan Produktivitas di Lantai Produksi Menggunakan Metode Objective Matrix,†Reka Integr., vol. 1, no. 4, 2013.
DOI: https://doi.org/10.52088/ijesty.v2i2.232
Article Metrics
Abstract view : 302 timesPDF - 184 times
Refbacks
- There are currently no refbacks.
Copyright (c) 2021 Defi Irwansyah, Cut Ita Erliana, Fadlisyah Fadlisyah, Mutammimul Ula, Mahlil Fahrozi, Rofiq Harun