Article Open Access

Governing Before the Bid: The Prequalification-Enforced Reverse Auction Framework for ERP-Embedded Public Sector Procurement

Vijaya Bhaskar Reddy Saadhu

Abstract


Competitive price discovery through electronic reverse auctions depends on enforcing vendor eligibility before the auction process begins rather than after contract award. In many public-sector Enterprise Resource Planning (ERP) systems, however, vendor prequalification is still managed through manual administrative procedures instead of embedded system controls, creating compliance gaps that lead to post-award disqualifications, procurement delays, audit findings, and inconsistent procurement outcomes. This article introduces the Prequalification-Enforced Reverse Auction (PERA) framework, a three-layer architectural model that embeds vendor prequalification directly into ERP reverse auction modules through user interface (UI)-level constraint mechanisms. The framework consists of Event-Level Lock, Participant-Level Lock, and Qualification-Level Lock, which collectively ensure that only vendors satisfying predefined eligibility requirements are permitted to participate in auction events. Vendor qualification is evaluated using a ten-dimensional Boolean assessment model organized into three governance domains: Technical and Operational Readiness, Financial and Commercial Governance, and Risk and Regulatory Control. To further improve procurement quality, the framework incorporates a price-signal diagnostic mechanism that analyzes preliminary pricing variance to identify potential specification ambiguity before auction creation. The proposed architecture was evaluated using implementation evidence from approximately 120 government agencies and more than 200 reverse auction events conducted within a state-level ERP procurement platform. The findings indicate that PERA substantially reduces post-award vendor disqualification incidents, improves regulatory compliance, standardizes vendor eligibility enforcement across agencies, and shortens procurement cycle times to approximately 60 minutes per auction event. By transforming prequalification from an administrative responsibility into an automated architectural constraint, the framework enhances transparency, fairness, auditability, and operational efficiency. The proposed PERA architecture provides a scalable and transferable design model for ERP-based public procurement systems without requiring changes to existing procurement regulations or upstream governance frameworks

Keywords


Electronic Reverse Auction, ERP Procurement, Prequalification Enforcement, Public Sector Governance, SAP SRM

References


L. R. Smeltzer and A. S. Carr, "Electronic reverse auctions: Promises, risks and conditions for success," Ind. Mark. Manag., vol. 32, no. 6, pp. 481–488, 2003.

W. Chen, M. Dawande, and G. Janakiraman, "Optimal procurement auctions under multistage supplier qualification," Manuf. Serv. Oper. Manag., vol. 20, no. 3, pp. 566–582, 2018.

N. C. M. Association and others, Contract Management Body of Knowledge®: CMBOK®Seventh Edition. National Contract Management Association, 2023.

S. D. Jap, "Online reverse auctions: Issues, themes, and prospects for the future," J. Acad. Mark. Sci., vol. 30, no. 4, pp. 506–525, 2002.

R.-K. Kukkonen, "Sustainable ICT systems and responsible ICT procurement: the role of enterprise architecture and in-house procurement," University of Jyväskylä, 2025.

L. Zakharkina, P. Rubanov, B. Alibekova, O. Zakharkin, and L. Moldashbayeva, "The impact of digital transformation in the accounting system of fuel and energy complex enterprises (international experience)," Int. J. Energy Econ. Policy, vol. 12, no. 5, pp. 152–161, 2022.

P. N. Dabholkar and H. Date, "Validation of objective-based ERP value factors measuring intangible benefits-Indian higher education context," Int. J. Bus. Inf. Syst., vol. 37, no. 1, pp. 1–28, 2021.

M. J. Moon, "The evolution of e-government among municipalities: rhetoric or reality?" Public Adm. Rev., vol. 62, no. 4, pp. 424–433, 2002.

L. Kaufmann and C. R. Carter, "Deciding on the mode of negotiation: to auction or not to auction electronically," J. Supply Chain Manag., vol. 40, no. 1, pp. 15–26, 2004.

M. Nechepurenko, "ForesightFlow: An information leakage score framework for prediction markets," arXiv Prepr. arXiv2605.00493, 2026.

D. C. Wyld, "Current research on reverse auctions: Part I-Understanding the nature of reverse auctions and the price and process savings associated with competitive bidding," Int. J. Manag. Value Supply Chain, vol. 2, no. 3, pp. 11–23, 2011.

M. S. Achieng, O. O. Ogundaini, and N. Mlitwa, "Enhancing Procurement Efficiency in South Africa through e-Reverse Auction Systems," J. Inf. Syst. Informatics, vol. 6, no. 4, pp. 2327–2346, 2024.

V. A. Mabert and J. A. Skeels, "Internet reverse auctions: valuable tool in experienced hands," Bus—Horiz., vol. 45, no. 4, p. 70, 2002.

D. P. Brown, A. Eckert, and D. E. H. Olmstead, "Procurement auctions for regulated retail service contracts in restructured electricity markets," Energy Econ., vol. 116, p. 106387, 2022.

A. Taghipour, S. Murat, and P. Huang, "E-supply chain management: A review," Int. J. e-Education, e-Business, e-Management e-Learning, vol. 11, no. 2, pp. 51–61, 2021.

F. Lichère, R. Caranta, and S. Treumer, Modernizing public procurement: The new directive. Djøf Publishing, 2014.

T. H. Davenport and others, "Putting the enterprise into the enterprise system," Harv. Bus. Rev., vol. 76, no. 4, pp. 121–131, 1998.

C. R. Holland and B. Light, "A critical success factors model for ERP implementation," IEEE Softw., vol. 16, no. 3, pp. 30–36, 1999.

M. L. Markus, S. Axline, D. Petrie, and S. C. Tanis, "Learning from adopters' experiences with ERP: problems encountered and success achieved," J. Inf. Technol., vol. 15, no. 4, pp. 245–265, 2000.

F. Fui-Hoon Nah, J. Lee-Shang Lau, and J. Kuang, "Critical factors for successful implementation of enterprise systems," Bus. Process Manag. J., vol. 7, no. 3, pp. 285–296, 2001.

A. R. Khoso, N. A. Memon, S. Sohu, F. Siddiqui, and J. S. Khan, "Decision criteria for assessment of contractors in prequalification phase of public projects," Int. J. Adv. Sci. Technol., vol. 29, no. 11s, pp. 2624–2635, 2020.

E. J. Umble, R. R. Haft, and M. M. Umble, "Enterprise resource planning: Implementation procedures and critical success factors," Eur. J. Oper. Res., vol. 146, no. 2, pp. 241–257, 2003.

V. Kvaratskhelia, "Startup Utilization Of Business Support: The Case Of Axel-Georgian Business Angel Network," 2026.

R. E. White and K. Cooper, "Case study research," in Qualitative research in the post-modern era: Critical approaches and selected methodologies, Springer, 2022, pp. 233–285.

S. C. Vankayala, "Architectural Approaches to Contract Testing in Event-Driven Kafka Systems," Eur. J. Adv. Eng. Technol., vol. 8, no. 6, pp. 185–191, 2021.

B. A. Mayienga et al., "A conceptual model for global risk management, compliance, and financial governance in multinational corporations," Int. J. Adv. Multidiscip. Res. Stud., pp. 1351–1363, 2024.

I. A. Adeniran, A. O. Abhulimen, A. N. Obiki-Osafiele, O. S. Osundare, E. E. Agu, and C. P. Efunniyi, "Strategic risk management in financial institutions: Ensuring robust regulatory compliance," Financ. Account. Res. J., vol. 6, no. 8, pp. 1582–1596, 2024.

V. Weerakkody, M. Janssen, and Y. K. Dwivedi, "Transformational change and business process reengineering (BPR): Lessons from the British and Dutch public sector," Gov. Inf. Q., vol. 28, no. 3, pp. 320–328, 2011.

S. Abutabenjeh and R. G. Rendon, "Procurement and contract management deficiencies: analysis of state audit reports," Int. J. Public Sect. Perform. Manag., vol. 11, no. 1, pp. 81–107, 2023.

S. Beall et al., "The role of reverse auctions in strategic sourcing," CAPS Res., 2003.

P. Klemperer, "Auctions: theory and practice," 2018.

S. Verma, "Lessons from Taj Mahal and from Sheesh Mahal; and from many Public Projects in Between," Available SSRN 5192498, 2025.

B. N. A. Anate, A. O. Iyadunni, M. Chukwunweike, Q. O.-P. Amarachi, and T. A. Titilope, "Advancing vendor management models to maximize economic value in global supply chains," Int. J., vol. 2, no. 2, pp. 42–50, 2023.




DOI: https://doi.org/10.52088/ijesty.v6i3.1865

Refbacks

  • There are currently no refbacks.


Copyright (c) 2026 Vijaya Bhaskar Reddy Saadhu

International Journal of Engineering, Science, and Information Technology (IJESTY) eISSN 2775-2674